AT LAST IT IS DONE.
ABS REMOVED
WOF AND REG, FINAL ONCE OVER AND POLISH ETC WAS COMPLETED YESTERDAY
TEST RUNS DONE AND ALL IS PERFORMING JUST LIKE IT SAYS ON THE CAN
ON THE TRACK THE TOP END ON THE SPEEDO WAS 207KPH, ON THE DYNO WAS 208.9 MAX
NOT BAD FOR 1989
HERES THE LIST OF WORK DONE:
All New Parts Throughout
List includes but is NOT limited to the following
NEW:
Rings,
Valve stem seals,
Timing Chain and Guides
Spark plugs,
Seals Gaskets,
Oil Air and fuel Filters,
Clutch Friction plate,
Throttle, Clutch and Choke Cables,
Steering head, Swingarm and Wheel bearings Front and Rear
Tyres,
Front disc rotors
Battery,
Brake Pads,
Thermostat,
Oil Pressure cutoff switch,
Headlamp Park lamp and Indicator Bulbs,
Indicators bullet style,
Fuel Tank Mounting Grommets,
Headlamp,
Number plate,
Mirrors,
Battery,
Riders foot peg rubbers,
New Oils, Antfreeze and Brake Fluids,
Tank Badges,
Sidecover Decals
Gear box overhauled,
Calipers overhauled,
Starter Motor recond,
Alternator recond,
Radiator pressure tested and cleaned
Pro Panel Shop 2 Pack Paint on Tank, Panniers, Side covers, Front guard, Wheels, Muffler Heat shield
OEM parts used wherever possible. Due to unavailability from BMW some (not many) Aftermarket parts have been substituted for OEMS
Frame was Sand Blasted, Zinc coated and then Powder coated.
Battery tray and ABS Cylinder frame powder coated
Fully serviced and final adjustments and tune carried out at BMW service agents
FINAL SET OF PICS (cloudy day) :
SO, ON FEB 13 2013 WE STARTED OUT WITH THIS (uggg)
THEN WE WENT TO THIS:
AND NOW, 9 MONTHS AND MANY HUNDREDS OF HOURS AND DOLLARS LATER WE HAVE THIS:
THANKS TO ALL FOR YOUR SUPPORT AND ASSISTANCE ON THIS CONVERSION AND THANKS FOR THE MANY POSTS COMMENTS AND PM'S. THIS FORUM IS A FANTASTIC RESOURCE FOR K LOVERS
SEE YAS IN THE WIND AND ON HERE :-))
REGARDS
KEITH