BMW K bikes (Bricks)


You are not connected. Please login or register

View previous topic View next topic Go down  Message [Page 1 of 1]


1Back to top Go down   Project Frankenbike. Time for a Cuppa. Empty Project Frankenbike. Time for a Cuppa. Thu Jun 24, 2021 11:04 am

Snowman

avatar
active member
active member
I start these projects with a rough time frame to complete. I never hit those dates so I should just make a cuppa tea and it will be done when it is done.
Project Frankenbike. Time for a Cuppa. Fairin11

    

Shep

Shep
Life time member
Life time member
So is that the air cleaner (red) below the new style radiator?
What is the purple piece?
Shep


__________________________________________________
Model        Production Date/Serial Number
K100RS      1984 July/ (F0040448)
K100RS      1986 Dec/ (H0142581)
    

Dai

Dai
Life time member
Life time member
Izaturbo Very Happy


__________________________________________________
1983 K100 naked upgraded to K100LT spec after spending time as an RS and an RT
1987 K100RT
Others...
1978 Moto Guzzi 850-T3, 1979 Moto Guzzi 850-T3 California,1993 Moto Guzzi 1100ie California
2020 Royal Enfield Bullet 500
    

Snowman

avatar
active member
active member
Shep wrote:So is that the air cleaner (red) below the new style radiator?
What is the purple piece?
Shep
Yes, the red air cleaner is on the turbo, the secondary induction is off the bike at the moment. The purple piece is also part of the turbo. The aluminium radiator is the intercooler for the turbo and the regular radiator is behind it.

    

Shep

Shep
Life time member
Life time member
Thank you for the explanation.
What approximate increase in hp do you expect?
Shep


__________________________________________________
Model        Production Date/Serial Number
K100RS      1984 July/ (F0040448)
K100RS      1986 Dec/ (H0142581)
    

moriarti

moriarti
Life time member
Life time member
With that setup he can expect about  affraid affraid affraid affraid Project Frankenbike. Time for a Cuppa. 61740 Project Frankenbike. Time for a Cuppa. 61740 Project Frankenbike. Time for a Cuppa. 61740 Project Frankenbike. Time for a Cuppa. 25650
Pluss or Minus a  Project Frankenbike. Time for a Cuppa. 61740 Project Frankenbike. Time for a Cuppa. 259495


__________________________________________________
1984 k100 rs red/black VIN  0004449 Now sold to Olaf
    

Snowman

avatar
active member
active member
About 145hp with mild boost from this setup but 185+hp is possible from the components I have. The engine is solid but with 60K turbo miles I don't want to push my luck. I do plan to rebuild the engine next year at which point I will turn up the boost and see what it will do.

    

Dai

Dai
Life time member
Life time member
IIRC the factory built the engine to take 175bhp and then de-rated it for production. IIRC.


__________________________________________________
1983 K100 naked upgraded to K100LT spec after spending time as an RS and an RT
1987 K100RT
Others...
1978 Moto Guzzi 850-T3, 1979 Moto Guzzi 850-T3 California,1993 Moto Guzzi 1100ie California
2020 Royal Enfield Bullet 500
    

View previous topic View next topic Back to top  Message [Page 1 of 1]

Permissions in this forum:
You cannot reply to topics in this forum